Full electrical install for new-build in Chobham

CompleteLighting install, Consumer unit, Socket install, EV charger install, New-build electrical installation · ChobhamCompleted November 2026

This new-build in Chobham started as a blank canvas, and the customer had a clear vision: architectural lighting throughout to really bring the space to life. The property is a converted oak frame building with super high ceilings, so getting the lighting design right was going to be crucial to how the finished space felt. We handled the full electrical installation from the ground up. Architectural fittings went in across the property, including recessed lights built into the floor to create pools of light and visual interest. The oak structure presented some challenges, particularly where we needed to run cables and install fittings without compromising the beams and existing framework, which meant planning the routes carefully and installing everything under the screen to keep it all hidden and tidy. On top of the lighting scheme, we installed a new consumer unit to manage the electrics, fitted sockets throughout, and got an EV charger in place. It's been a thorough job from start to finish, and the architectural lighting really does transform how the space works.

Updates

  1. Completed main hall showing full architectural lighting installation throughout oak frame building.
    Finished

    Completed main hall showing full architectural lighting installation throughout oak frame building.

    November 2026

  2. Interior of the oak frame building with structural timbers exposed, initial site meeting completed and work ready to begin..
    Started

    Interior of the oak frame building with structural timbers exposed, initial site meeting completed and work ready to begin..

    November 2026

  3. 1st fixing underway, getting cable routes concealed in the floor space.
    In progress

    1st fixing underway, getting cable routes concealed in the floor space.

    November 2026

  4. 1st fixing cables, ducting and trunking in place in the floor
    In progress

    1st fixing cables, ducting and trunking in place in the floor

    November 2026

  5. Mezzanine 1st fix sockets and lighting
    In progress

    Mezzanine 1st fix sockets and lighting

    November 2026

  6. 2nd fix ready to begin. Painter has mist coated so it’s ready for our socket and light switch faceplates to be installed
    In progress

    2nd fix ready to begin. Painter has mist coated so it’s ready for our socket and light switch faceplates to be installed

    November 2026

  7. Painted and ready for second fix of lighting and sockets
    In progress

    Painted and ready for second fix of lighting and sockets

    November 2026

  8. Two-part consumer unit with circuit breakers and cables installed and ready for connection.
    In progress

    Two-part consumer unit with circuit breakers and cables installed and ready for connection.

    November 2026

  9. Mezanine ceiling showing architectural lighting installed along beams with oak structure visible.
    In progress

    Mezanine ceiling showing architectural lighting installed along beams with oak structure visible.

    November 2026

  10. Brick chimney stack viewed from below with recessed lighting installed around it.
    Finished

    Brick chimney stack viewed from below with recessed lighting installed around it.

    November 2026

  11. Bathroom vanity area with wall-mounted lighting, mirror, and decorative wall finish.
    Finished

    Bathroom vanity area with wall-mounted lighting, mirror, and decorative wall finish.

    November 2026

  12. Wet room with shower area, heating rail, and architectural wall lights installed.
    Finished

    Wet room with shower area, heating rail, and architectural wall lights installed.

    November 2026

  13. Worked with a specialist company to deliver the renewables installation on this project. Solar, EV charger and battery storage units mounted on external wall with connected cabling.
    Finished

    Worked with a specialist company to deliver the renewables installation on this project. Solar, EV charger and battery storage units mounted on external wall with connected cabling.

    November 2026

  14. Spiral staircase with recessed floor lights installed along the treads and sides.
    Finished

    Spiral staircase with recessed floor lights installed along the treads and sides.

    November 2026

  15. Open plan kitchen and dining area with architectural ceiling lights and oak frame structure.
    Finished

    Open plan kitchen and dining area with architectural ceiling lights and oak frame structure.

    November 2026

  16. Main hall with architectural lighting installed throughout oak frame and around brick chimney.
    Finished

    Main hall with architectural lighting installed throughout oak frame and around brick chimney.

    November 2026

  17. Consumer unit enclosure showing circuit breakers, switches, and electrical connections inside cabinet surrounded by metal containment. Showing Networking distribution above and remote drivers for architectural lighting.
    Finished

    Consumer unit enclosure showing circuit breakers, switches, and electrical connections inside cabinet surrounded by metal containment. Showing Networking distribution above and remote drivers for architectural lighting.

    November 2026

  18. Installed recessed lights to this log burner with chimney, hearth, and surrounding brickwork.
    Finished

    Installed recessed lights to this log burner with chimney, hearth, and surrounding brickwork.

    November 2026

  19. Mezzanine level with architectural pendant lights and recessed ceiling lights throughout space.
    Finished

    Mezzanine level with architectural pendant lights and recessed ceiling lights throughout space.

    November 2026

  20. Close view of oak timber frame with installed architectural lighting strip along beam.
    Finished

    Close view of oak timber frame with installed architectural lighting strip along beam.

    November 2026

More jobs

Need similar work?

Get in touch about your project and we'll come and quote.

Get a quote

Accredited and trusted